The Jubilee Government promised to launch SGR trains by June 2017. The dreams of a mega project costing about 400billon shillings is becoming a reality.
So far, the railway line is in Nairobi and already 3 locomotives in Mombasa port.
As for the normal Kenya, here are some common features about 10 of them you will need to know about them.
Kenya Raiways which will be operating the locomotives have shared some key features below.
The first out of the 32 passenger coaches being offloaded ##TheTrainsAreHere pic.twitter.com/Qxfrp22o9F
— Kenya Railways (@KenyaRailways_) January 28, 2017
Live demo of the features you'll have on the First Class Passenger Coach #TheTrainsAreHere pic.twitter.com/GDiQMLbIXM
— Kenya Railways (@KenyaRailways_) January 29, 2017
Here are some of the facts on SGR #SGRPassengerTrains pic.twitter.com/BPag38AIaG
— Kenya Railways (@KenyaRailways_) January 30, 2017
#SGRPassengerTrains the sitting capacity on each coach unit will be as follows:
1. Business – 44pax
2. First – 72pax
3. Economy – 118pax
— Kenya Railways (@KenyaRailways_) January 30, 2017
Introducing the model locomotives that have arrived at Mombasa Port today #TheTrainsAreHere pic.twitter.com/V4ykMLsMeL
— Kenya Railways (@KenyaRailways_) January 28, 2017